Aroleap Installation Guide


Once you are done placing the order, we tend to dispatch the product within 3-4 working days. We will ensure that you are constantly updated about the progress of your order. After you have received the Aroleap smart home gym equipment we will get in touch with you to schedule the installation.



Aroleap - The All in one Home Gym Equipment

About The Machine


The Aroleap home gym is a device created to allow smarter workouts, right at home. With more than 150 exercises that you can do with this machine, every muscle group of your body can be targeted. AI powered training sessions will not only track your progress, but also suggest better methods of working out and give you real time tracking and insights. 



Tools Required for Installation


During the installation, our team will use the following tools to ensure sturdy mounting of the machine -


  1. Hammer Drill Machine


    • a - with SDS plus chuck/tool holder

  2. Wall Drill Bits


    • 8 mm
    • 13 mm

  3. Spanner


    • 13 mm

  4. Adjustable Wrench


    • 10 inch

  5. Allen Key


    • 3 mm
    • 4 mm
    • 6 mm

  6. Screwdriver


  7. Hammer




Things required from you during installation


In order to complete the installation properly, you will have to keep the following ready:


  1. Internet Connection


    You will need a strong and reliable WiFi connection that will allow for the streaming of audio and video.


  2. Power Outlet


    The machine needs a grounded, 3 prong power outlet (6A standard socket will be sufficient). The location of the power outlet needs to be within 4.5 feet of where the machine will be installed. In case the same is not available, you can make use of extension cords.


  3. Supporting Walls


    Aroleap can be easily installed on most solid brick and solid concrete walls.


  4. Space Required


    A total of 4x2 square feet of space will be needed. The ideal space requirement would be 6 feet along the wall on which the Aroleap is being installed (3 feet on either side from the centre of the machine) and another 6 feet outwards from the wall.


  5. Ceiling Height


    The ideal height clearance is 7.2 feet, as this will allow for the complete extension of the adjustable arms of Aroleap.  However, the minimal space requirement would be 3.2 feet along the wall and 7.2 feet for the height. 

Aroleap - The All in one Home Gym Equipment



Installation steps for the smartest home gym equipment


Aroleap is easy to install and will be up and running in minimal time. The packaging will come complete with everything required including the body, the flat bench, accessories inclusive of D-handles, rope, barbell and ankle straps. 

Here are the steps that our installation team will follow to setup your home gym:


  1. Getting the machine out


    • Once the box has been opened, the 10 allen bolts on either side of the mirror will be removed and the mirror will be taken out with extreme care. 

    • The 4 nuts on the frame will be removed next, which will allow for the removal of the machine from the packing. 

  2. Drilling holes in the wall


    Once the exact location of the machine has been determined, the marking for the drilling process can start. 


    • The machine, without the mirror, has to be held firmly against the wall, ensuring that there is no gap. 

    • Using a long thin pencil, the spots for drilling need to be marked through the frame. Our team will check and recheck to ascertain that the markings are absolutely precise. 

    • Now the machine can be kept aside and using the 8mm drill bit, the first holes can be made. Then, using the 13mm drill bit, the holes can be enlarged for the anchor bolts.

  3. Installing anchor bolts


    • All the anchor bolts have to be checked, before being installed and once placed in the drilled holes, they have to be tightened to the level that the threads are no longer visible.

    • After the anchor bolts have been inserted completely and tightened, the bolts can be removed.

  4. Mounting the machine


    • Now the machine is ready to be mounted. Our team will ensure that the machine is aligned with the holes on the wall.

    • Along with the 5mm thick spacers, that will be provided, the longer bolts can be fixed and this will allow for the machine to be properly bolted to the wall. The longer bolts have to be used for the bottom 4 holes, while the shorter bolts are meant for the 2 top holes.

    • All the Allen bolts need to be tightened completely and properly. A total of 4x2 square feet of space will be needed. The ideal space requirement would be 6 feet along the wall on which the Aroleap is being installed (3 feet on either side from the centre of the machine) and another 6 feet outwards from the wall.

  5. Closing the machine


    • The tablet that is provided with the machine has to be installed first.

    • The tablet needs to be tightened to the level, where you can move it with ease, but stays in the position that you leave it in.

    • The cable that comes out of the tablet, needs to be connected with the charger inside the machine. Proper points have been provided inside the machine to ensure proper routing of the cable. This ensures that there is no loose cable inside the Aroleap.

    • The tablet can now be turned upwards and the mirror can now be closed. The 10M5 Allen can be used to bolt the mirror to the machine.

FAQs

Company
About Us
Product Related
Machine Installation Guide
Warranty
Legal
Terms and Conditions
Privacy Policy
Shipping Policy
Contact info

Product Enquiry

+91 7618710191
+91 6268219941
+91 7838185350

Business Enquiry

contact@aroleap.com
Office address
Aroleap Fitness Private Limited
No. 19, 3rd cross road, Shankarappa Garden,
Magadi Road, Bangalore 560023
Social
© Aroleap 2020-2024